BRIEF INTRODUCTION

The Chief Minister of Sindh announced / accorded approval on 24-03-2009 for to establish a Constituent College of MUET at Khairpur Mir’s.

To prepare the scheme for the short term in order to provide physical facilities to start the B.E. degree programme from 2010 in the following disciplines:

  • Civil Engineering.
  • Electrical Engineering
  • Mechanical Engineering
  • Petroleum & Natural Gas Engineering

The Mehran University will undertake the responsibility and also take immediate initiatives for full fledged Constituent Engineering College at Khairpur Mir’s.

Instead of starting the classes of the 1st batch of Engineering College in the premises of GCT Khairpur, the premises of Bureau of Curriculum & Blind School Complex were selected due to the reason that;

Not only the space offered by GCT was insufficient but the prevailing environment were not good which could motivate / attract the faculty and students to make a good start.

Keeping in view the past experience, it was suggested to provide an independent premises/ place to avoid the chances of inter mixing and possible disputes and disturbances between the students of two institutions of different levels.

Preparation of PC-I for rehabilitation & Development of existing premises by the 20th May, 2009.

Approval of PC-I by 25th May, 2009.

Issuance of notification by Education & Literacy Department, Govt. of Sindh for transfer of premises by 15th June, 2009.

Acquiring 82-10 acres of land including 50 acres belonging to Govt. of Sindh by 15th June, 2009.

Making of premises fully ready for commencement of classes from the Academic year January, 2010.

ACTION PLAN FOR ESTABLISHMENT OF

MEHRAN UNIVERSITY COLLEGE OF ENGINEERING & TECHNOLOGY,

AT KHAIRPUR MIR’S

 

 S.#: SUB ACTIVITY Target Date
1. PREPARATION OF PC-I SCHEME 20th of May, 2009
2. APPROVAL OF PC-I SCHEME 25th May, 2009
3. RELEASE OF FUNDS 30th June, 2009
4 REHABILITATION WORK OF EXISTING PREMISES 25th of Dec, 2009


pdpic

Scheme:-Development of New Infrastructure and Other Essential Facilities Required For Establishment of MUCET, Khairpur Mir’s.

The Chief Minister Sindh issued directives to P&D Department for making a provision of Rs. 1000.000 (M) in the ADP of Sindh Government.

MUET prepared a scheme costing Rs. 999.168 (M) for development of new infrastructure and other essential facilities required for establishment of Mehran University College of Engineering & Technology, at Khairpur Mir’s and submitted with the Sindh Government for approval on 21-05-2010.

New Constructions are started and ongoing projects are Under.

  • Department of Civil Engineering Covered Area 32033 Sft
  • Department of Electrical EngineeringCovered Area 31308 Sft
  • Department of Petroleum & Natural GasCovered Area 26233 Sft
  • Department of Basic Science & Related StudiesCovered Area 26233 Sft
  • Residential Facilities for Teaching and Non Teaching StaffCovered Area 18558 Sft
  • Central LibraryCovered Area 15000 Sft
  • AuditoriumCovered Area 5320 Sft
  • Transport Section and Bus Parking sheds etcCovered Area 3806 Sft
  • Cafeteria & MosqueCovered Area 5919 Sft

 

Scheme:-Development of Remaining Essential facilities required for establishment of MUCET, Khairpur Mir’s.

The Chief Minister Sindh issued directives to P&D Department for making a provision of Rs.847.728 (M) in the ADP of Sindh Government.

MUET prepared a scheme costing Rs.847.728 (M) for development of remaining essential facilities required for establishment of Mehran University College of Engineering & Technology, at Khairpur Mir’s and submitted with the Sindh Government for approval on 21-05-2010.

 

New Constructions are started and ongoing projects are Under.

  • Residential facilities for students, Teaching and Non-Teaching Staff
  1. Boys Hostel (for 450 Students)
  2. Girls Hostel (for 300 Students)
  3. Residential Facilities for Teaching and Non-Teaching Staff
  • Civic Amenities & Communal Facilities
  1. Development of Civic amenities for students and Staff viz. Health Centre, Shopping Centre and Mosque.

 

 

Employees Working at Project Directorate of Mehran University of Engineering & Technology Shaheed Z.A Bhutto Campus Khairpur Mir’s.

Sr.# Name of Employee Designation BPS
1 SajjadHussainMemon Project Director Contract Basis (Fixed)
2 Safdar Ali Sahito Superintendent 17
3 ShahidHussainChanna Assistant Engineer (Civil) 17
4 Naveed Ali Brohi Assistant Engineer (Electrical) 17
5 Muhib Ali Kandhir Accountant Contract Basis (Fixed)
6 Muhammad YaqoobSolangi Office Assistant 14
7 Syed BadarHussain Shah Assistant Plantation 11
8 Nisar Ahmed CCPO 07
9 Zulfiqar Ali Ghumro Sub-Engineer 07
10 FarhanImtiaz CCPO 07
11 Fayaz Ali Rajput CCPO 07
12 Hidayatullah Electrician 05
13 ImamuddinShar Plumber 05
14 Aitbar Ali Electrician 05
15 Faheem Ahmed Plumber 05
16 Hafeez Ahmed Carpenter 05
17 Waheed Ahmed Phulpoto Driver 05
18 Imam Dino Channa Painter 05
19 Allah Warayo Alias Iqbal Mason 05
20 AhsanullahKandhir Carpenter 05
21 GhulamHyder Generator Operator 03
22 Allah Dino NaibQasid 02
23 FidaHussain NaibQasid 02
24 TemasMasih NaibQasid 02
25 Syed Waseem Shah Mason Helper 02
26 Saeedullah Attendant 02
27 SaleemAkhtarChandio Lab Technician Contract Basis (Fixed)
28 Naveed Ahmed Channa Electrician Contract Basis (Fixed)
29 Naseer Ahmed Ansari Electrician Contract Basis (Fixed)
30 GhulamMurtazaLangah Electrician Contract Basis (Fixed)
31 Abdul MajeedShaikh Electrician Contract Basis (Fixed)
32 KaramHussain Mari Mason Helper Contract Basis (Fixed)
33 ZahidHussainPhulpoto Driver Contract Basis (Fixed)